Close

ANDHRA PRADESH MEDICAL SERVICES AND INFRASTRUCTURE DEVELOPMENT CORPORATION

Deparmental  Activities:

  • Providing infrastructure facilites like construction of a Hospital buildings maintenance of hospital building/errection of installation of PSA Plants/ LMO Tanks/ Providing of Oxygen, Vaccum, AIR,Copper
  • Receiving of Surgicals, Consumables, Medicines, Equipment etc from Head Office as

per the sanctioned budget to the individual Hospitals /104 mobile Medical units , Health wellness Center ,Urban Health centers programme Medicines in the district and distributibuting against the indents raised by the Hospital authorities .

  • Supply and Distribution of D-Type Bulk cylinders ,Oxygen concentators, and ventilators in carona 1st & 2nd and 3rd

 Brief notes on State Govt. Schemes implemented:

  • Nabard schemes
  • DME
  • CSS
  • NHM
  • Ayush
  • DopH
  • CFW

 Scheme-Wise progress (along with target and achievements) of the above scheme:

Sl. No.

Name of the work

Admn.san ction amount (Rs. Lakhs)

Expenditur e incurred so for (Rs.Lakhs)

Probable date of completion

C)

NABARD

 

1)

Strengthening of 100 bedded Area Hospital at Tuni.

1020.00

96.88

31.12.2022

2)

Strengthening of 30 bedded CHC at Jaggampeta.

657.00

3.91

31.12.2022

3)

Strengthening of 30 bedded CHC at Gokavaram.

599.00

26.19

31.12.2022

4)

Upgradation of 30-50 bedded CHC at Yeleswaram.

300.00

52.82

31.12.2022

5)

Upgradation of 30-50 bedded CHC at Prathipadu.

850.00

52.95

31.12.2022

6)

Strengthening of 30 bedded CHC at Rowthulapudi.

699.00

63.23

31.12.2022

D)

DME CSS

 

 

 

 

 

7)

construction of Trauma care centre & Procurement of Equipment to Govt General  Hospital,kakinada.

750.00

52.42

25.08.2022

E)

DME State

8)

Completing the G+1 MCH building at GGH, kakinada.

630.00

0.00

Earlier sanction not sufficient building not completed in full shape

H)

Drug Control Building (DG, DCA)

 

 

 

9)

Building for Drug inspector Kakinada

56.25

19.00

Completed

10

Building for Drug inspector Tuni

45.00

14.00

Completed

I)

NHM

 

 

 

11

Central Drug Stores,Kakinada

196.00

41.53

31.03.2022

Contact details (mobile, e-mail, website)

 

Deputy Executive Engineer

eehmhidckakinada[at]gmail[dot]Com

 8978680802

Success story of the department or any highlighted, along with photos if available:

i)  Errection & Installation of LMO Tanks GGH,Kakinada.  –  10KL, 20KL during second wave under CSR

ii) Errection & Installation of PSA Plant at Peddapuram     –  500 LPM Govt of A.P.

iii) Errection & Installation of PSA Plant at Tuni                   –  1000 LPM Govt of A.P.

iv) Errection & Installation of PSA Plant at Prathipadu       – 200 LPM Under CSR

v) Errection & Installation of PSA Plant at GGH,Kakinada –  1000 LPM Govt of India

vi) Errection & Installation of PSA Plant at GGH,Kakinada – 2X1000 LPM Govt of AP

Supply & Installation of the following items. 

Sl.No

Name of the Hospital

Oxygen line Beds

Ventilate rs

D-Type Cylinders

B-Type Cylinders

Oxygen concentrators

1

GGH, Kakinada

1800

260

86

225

125

2

AH, Tuni

54

 

100

60

100

3

CHC, Gokavaram

20

 

40

3

30

4

CHC,Peddapuram

31

 

50

12

50

5

CHC,Prathipadu

38

 

50

10

50

6

CHC,Yeleswaram

46

 

50

9

50

7

CHC,Pithapuram

33

 

52

4

50

8

CHC,Samalkota

50

 

50

3

50

9

CHC,Jaggampeta

43

 

30

5

30

10

CHC,Rowthulupudi

29

1

30

2

50